Our Projects

Some of our most recent projects have included bridge design/builds in Kananaskis Country, bioengineering along the banks of the Bow River in Calgary, remediation of impacted soil sites, and constructing flood protection along rivers and creeks throughout southern Alberta.

preparation of the footings for a house build

Residential Footing Preparation (2026)

Site excavation and footing preparation completed for a new home build, providing a stable foundation for the next phase of construction.

utility work with enmax

ENMAX Utility Infrastructure

Underground utility construction completed for ENMAX, supporting the installation and maintenance of reliable electrical infrastructure through safe and efficient project execution.

New Arena Power Infrastructure – Phase One (2026)

Phase one of underground power infrastructure installation, supporting the delivery of electrical service to Calgary’s new arena development.

Utility infrastructure work completed for ENMAX on 4th Avenue, supporting critical power services with safe, efficient, and reliable construction.

ENMAX 4th Avenue Power

Utility infrastructure work completed for ENMAX on 4th Avenue, supporting critical power services with safe, efficient, and reliable construction.

A durable steel and timber bridge constructed at Etherington Creek in 2019, built to provide reliable access while blending with the natural surroundings.

Etherington Creek Bridge

A durable steel and timber bridge constructed at Etherington Creek in 2019, built to provide reliable access while blending with the natural surroundings.

Crowsnest Pass Bridge at Night Photo 2

Crowsnest Pass Golf Club Bridge

A custom-designed and built bridge completed for the golf course at Crow’s Nest, delivering a durable, functional crossing that complements the surrounding landscape.

Poplar Island

Bow River Island Reclamation

Following the 2013 Bow River flood, this Alberta Parks reclamation project involved removing flood debris from an environmentally sensitive island in the Bow River, restoring the site while protecting its natural ecosystem.

scalping a basement project

Basement Excavation Preparation (2025)

Site scalping and excavation completed to prepare for a residential basement project, ensuring a clean and properly graded work area for construction.

underground power ducts installation that connect manholes

Underground Power Duct Installation (2025)

Installation of underground power duct banks connecting utility manholes, providing a durable and reliable pathway for critical electrical infrastructure.

Removal of concrete pillars as part of an ENMAX reclamation project near the Stampede Grounds, preparing the site for restoration and future infrastructure work.

ENMAX Reclamation Project (2025)

Removal of concrete pillars as part of an ENMAX reclamation project near the Stampede Grounds, preparing the site for restoration and future infrastructure work.

Ground protection matting installed to provide truck access while preserving the lawn for a wedding event, ensuring the site remained protected throughout construction activities.

Temporary Access Matting 2025

Ground protection matting installed to provide truck access while preserving the lawn for a wedding event, ensuring the site remained protected throughout construction activities.

Deep excavation for a precast concrete utility vault, completed with properly sloped excavation walls and safe site access to support underground power infrastructure installation.

Manhole excavation 2025

Deep excavation for a precast concrete utility vault, completed with properly sloped excavation walls and safe site access to support underground power infrastructure installation.

matting and removing the pole for enmax

ENMAX Pole Removal & Access Matting (2024)

Temporary access matting and utility pole removal completed for ENMAX, providing safe site access while supporting efficient infrastructure upgrades.

River job out by Longview, where we are doing bank reclamation after the 2013 flood. Done in 2018+

Longview Riverbank Reclamation (2018–2019)

Riverbank reclamation and restoration work completed near Longview following flood impacts, stabilizing the shoreline and restoring the surrounding river environment.

2017 major bioengineering job on the Bow River for the city of Calgary.

Bow River Bioengineering Project (2017)

Major riverbank bioengineering project completed for the City of Calgary in 2017, using natural stabilization techniques to protect the shoreline and enhance long-term environmental resilience.

Before picture of the Nordeg bridge project before it was built

Nordegg Backcountry Bridge Installation (2016)

A remote bridge project in Nordegg, where the bridge structure was transported 18 km into the backcountry before installation, providing durable access in a challenging environment.

After picture of the fix up of the sides of the Kananaskis River

Kananaskis Golf Club Riverbank Restoration (2016)

Riverbank restoration completed at Kananaskis Golf Club, stabilizing the shoreline and enhancing the surrounding landscape after erosion repair work.

Big elbow steel and wood bridge that was flown in with a helicopter. Done in 2020

Big Elbow Steel & Timber Bridge (2015)

Design and installation of a steel and timber bridge at Big Elbow, flown into place by helicopter in 2020 to provide durable access in a remote location.

Ready to work together?

From complex infrastructure projects to residential site development, we deliver reliable solutions backed by experience and quality workmanship.